ISLE OF CAPRI CASINO
Isle Of Capri Casino Modern Piping was responsible for the plumbing and HVAC on a design-build basis for this high visibility project. This project included a 200-room high-rise hotel with an attached state-of-the-art Casino totaling 325,500 square feet. This project started in March of 2006. Modern Piping ensured the Casino opened on time and within budget in July 2007.