ISLE OF CAPRI
Isle Of Capri Modern Piping was responsible for the plumbing and HVAC on a design and build basis on this high visibility project that started in March, 2006. This project included a 200-room high-rise hotel with an attached state-of-the-art Casino with 325,500 square feet total. Modern Piping ensured the Casino opened on time and within budget in July 07.