 |
|
Modern
Piping was responsible for the plumbing and HVAC on a design
and build basis on this high visibility project that started
in March, 2006. This project included a 200-room high-rise hotel
with an attached state-of-the-art Casino with 325,500 square
feet total. Modern Piping ensured the Casino opened on time
and within budget in July 07.
|
|
|